Skip to content

FAQ

What contingency should I keep for a villa?

Many owners keep 8–12% beyond the contracted package for design changes, soil surprises and outdoor upgrades — written separately from the contractor’s scope.

Many owners keep 8–12% beyond the contracted package for design changes, soil surprises and outdoor upgrades — written separately from the contractor’s scope.